The entire home needs to be designed, and a proposed site plan must be developed before a final contract can be created. In order for Corey’s Construction to move to the permit stage, the Client must sign their final contract, and Corey’s Construction needs payment of the first draw. Corey’s Construction will complete the following:
A FULL DESIGN OF ONE (1) SELECTED FLOOR PLAN. This will require a design consultation meeting. Our first design consultation will cover the entire structure and budget. Please anticipate a 2-4 hour meeting (additional in-person design consultation time will incur additional cost outside of the deposit). This meeting will need to take place at a scheduled time (regular business hours are Monday–Friday, 9:00 AM–5:00 PM). Availability of meeting times is not guaranteed, and the Design Consultation may be scheduled several weeks out. This Design Consultation cannot be scheduled until the New Project Introduction form is completed and the following documents have been provided: Deed, Registered Plat and/or Site Plan. If these documents cannot be found, Corey’s Construction can assist or locate them for you at your cost. Following the Design Consultation, we will need 3-4 weeks to develop your first draft (DES-1).
UP TO 2 DESIGN/BUDGET REVISIONS. (REV-1 and REV-1a). Following your review of the provided DES-1 package, Corey’s Construction asks that you list as many alterations as needed or desired on the Revision Request form. Each submitted Request form is considered one (1) revision. Whether the Revision request form has 1 alteration or 30, it counts as 1 request. This agreement will allow for 2 full Design Revisions. The first returned revision will be called REV-1. If needed, the second revision will be called REV-1a. You, the Client, agree to submit all Revision Requests using the Revision Request documents provided by Corey’s Construction. (Additional Revision Requests may be made, and will be billed at the hourly designer rate). Corey’s Construction will return Revisions in 2-3 weeks. You will be given the opportunity to do a thorough review of all completed Revision Requests to verify the revision(s) have been documented as requested. The On-Site Land Analysis Consultation must be completed prior to Corey’s Construction’s return of the first Revision Request (REV-1).
AN ON-SITE LAND ANALYSIS CONSULTATION. All requested land information must be provided prior to scheduling this consultation. The purpose of this consultation is to review and assess the needs of your lot to develop a proper site plan and budget accordingly. All site engineering is the financial responsibility of the Client. Corey’s Construction can facilitate all site development engineering at the expense of the Client. Corey’s will also provide one Surveying Stake Out. (It is the responsibility of the Client to ensure the stakes are not damaged or removed.) The area of the house and septic location must be mowed prior to the Consultation. Availability of meeting times is not guaranteed, and the meeting(s) may be scheduled several weeks out.
MAXIMUM OF FOUR HOURS FOR MATERIAL SELECTION MEETING(S). This meeting will need to be scheduled during regular business hours (Monday–Friday, 9:00 AM–5:00 PM). (This meeting may be broken into two (2) meetings if required.) Availability of meeting times is not guaranteed and these meeting(s) may be scheduled several weeks out. Full updated prints (SEL-1) will be provided within 14 days after the consultation.
UP TO 2 SELECTION/BUDGET REVISIONS. (REV-2 and REV-2a). Following your review of the provided SEL-1 package, Corey’s Construction asks that you list as many selection alterations as needed or desired on the Revision Request form. Each submitted Request form is considered one (1) revision. Whether the Revision request form has 1 alteration or 30, it counts as 1 request. This agreement will allow for 2 full Design Revisions. The first returned revision will be called REV-2. If needed, the second